Tucson Unified School District (TUSD) choose Arizona Gym Floors to adhere to their demanding schedule to install a new gym floor to replace the water damaged 50 year existing gym floor at the Rincon High School. The floor was damaged by a leaking drinking fountain and needed replacement. Because the gym was initially was installed with a SAND leveler under the floor, the concrete slab was so out of level the best economical solution was to install Aacer’s ScissorLoc™floor system, with the 3/4″ foam option. The Scissor-Loc floor system is the only wood floor that has been flooded twice and is still in use today. www.azgymfloors.com